Duration of Stratum Install: May 2020 – November 2020

Client: Oxford University

Main Contractor: Laing O’Rourke

Project Details: Stratum have a returning customer in Oxford University. We supplied and installed our resin flooring in the Biochemistry Labs during Phase One, eleven years later they requested Stratum applied the same flooring systems again to Phase Two, the new extension. Stratum delivered the project in collaboration with Bolidt, our European partner, installing 7000m² of resin flooring using three different systems. The requirements for the flooring were for hardwearing and functional finishes, that were seamless in nature for hygiene.  Systems were selected to meet the specific demands of each space.  

Bolidtop 700 – series was used in all practical areas of the building providing a sound and safe working environment.

Bolidtop 525 – series was installed throughout the labs, wc’s and atrium creating a smooth, seamless finish.

Bolidtop 525 Combi was applied on the main feature staircase running through the central atrium. This flooring solution was selected to further reduce contact noise and sound transfer on the structural steel stair.  

Stratum are proud of this project, and delighted to contribute to a building of such importance.